briefing Soluna Holdings. My name is John Roy. I cover technology here at Water Tower Research, and I am very pleased to have John Belizaire. He is the CEO. Welcome, John.

John BelizaireCEO

How are you doing? I am doing great, John.

John BelizaireCEO

Thanks for having me on this Insights conference. It is fantastic to be here, and it is also nice to see you. Haven't talked in a while.

John RoyAnalyst

Yes. No, definitely. You guys are definitely doing a lot of things, which we will be getting to. One thing I should mention before we get started is that you can see safe harbor statements for Soluna on their website. Also, investor questions are encouraged. Please enter them into the chat box and we will address them as soon as possible, and possibly in the follow-up management series report, which we will be doing. Those wishing to request a meeting with Soluna can go through the conference portal. With that, we will go ahead and get started on Q&A. John, how does Soluna convert standard renewable energy into computing power? That certainly is the trick of what you guys are doing. I am really curious as to, for those that don't know, how does it actually work?

John BelizaireCEO

Sure. Soluna builds data centers directly at renewable generation facilities or power plants that have excess or unused power. It is a little-known secret that over the last 20 to 25 years or so, renewable energy power plants have been built out all over the world, and that overbuild, if you will, has resulted in this challenge where some of those power plants, upwards of 50% of their power, never makes it to the grid. We go to those locations and we build our data centers behind the meter. That means the campus sits on the same side as the substation of the power plant's own assets, rather than forming a new interconnection to consume the power. That approach, that behind-the-meter approach, is our core model.

John BelizaireCEO

Wind and solar plants, as I said, across ERCOT and other parts of the country, have large amounts of unused or potential energy that never makes it to the grid. The energy's already built, it's already clean, and it evaporates when it's unused and being on the wrong side of the transmission infrastructure. By bringing our load to that generation point where the power already is, that allows us to get access to an interconnection point to draw power from the grid and the power plant.

John BelizaireCEO

That essentially bypasses the need for new transmission, and that compresses the time from years, if we did this going to a point on the grid where we were forming a new connection, that can take years to months, about 18 months in Soluna's case, which greatly reduces the time it takes to get to that power, so speed to power, and lowers the cost of that energy. The pipeline that we have, which is pretty sizable these days, is dual-focused. We've got two workloads, if you will. One is different stages of a site's life. One is building a data center that essentially does one form of compute, and now we're shifting to building a data center that does a new form of compute.

John BelizaireCEO

The core thesis for our business is essentially that by taking this approach, we can get access to power faster, use that power to power AI, HPC, and Bitcoin hosting, what we do today. We have 206 megawatts of this model operating today, and we have over 6.3 gigawatts in a total pipeline that we're developing in various stages.

John RoyAnalyst

Excellent. Thanks for that overview. Project Kati 1. I think you did a deal with Bitdeer not too long ago. Was curious as to how that's going and what kind of operational capacity you think you're going to be dedicating to that effort.

John BelizaireCEO

Yeah, you are right. This summer, we announced a deal with an affiliate of Bitdeer Technologies. We are going to be deploying approximately 28 megawatts of Bitcoin equipment at Project Kati 1. That is the Bitcoin side of the Project Kati site. I think that is about close to 2 exahash. The deployment begins, actually, it is beginning this month, and it is going to be ramping in batches in the site's K1BC phase. What is notable about this particular structure is that it is a co-mining agreement, which is new for our Bitcoin platform. Soluna essentially provides the site, the power, and turnkey operations. Bitdeer provides its own miners and Pro Air equipment, and then we share in the proceeds from the mining operation. So a big shift from our fixed-fee model. Under co-mining, we participate more directly in what the infrastructure produces, which means more exposure to mining economics and, of course, the upside of that.

John BelizaireCEO

The key is that we are monetizing those megawatts for our platform and the partner. On Kati 1 more broadly, just a reminder perhaps for folks, it is an 83-megawatt wind-powered site in Willacy County, Texas, and it is delivering its first gross profit in the second quarter. We have provided a host of expectations on the size of the footprint, but we do not talk about revenue expectations. We expect it to be a pretty robust partnership at Kati 1.

John RoyAnalyst

Excellent. You also acquired some land recently, about almost 400 acres for Project Dorothy III, I believe.

John RoyAnalyst

I was curious as to the thinking behind that, and maybe some color on. That is going for AI computing, I assume?

John BelizaireCEO

It is. Dorothy III is the second AI campus we are developing in our pipeline. The first is Kati 2. It is the site across the street from Kati 1, the project I referred to earlier. Dorothy III is planned to be upwards of a 300-megawatt campus. Over the second quarter, right at the start of the second quarter, we completed the vertical integration of Dorothy I and II. There, we acquired the wind farm that powers the Dorothy projects on April 1st. Then we brought out all of our partners at Dorothy 1A and 1B, so we now own the generation and the computer across all of those 50 megawatts of Dorothy I. The 390 acres that you refer to, 390, give or take, plus acres that are under contract and closed on the acquisition of that, support the initial build-out of Dorothy III.

John BelizaireCEO

Like I said, it is going to be over about 300 megawatts of AI HPC capacity. The master planning is underway. Design teams are mobilizing. We are starting to invest in some long-lead equipment procurement that is required for this type of project. We have launched environmental surveys and fiber studies for the site. Once that is complete and some of the design work is complete, we will start to market that site to potential customers. Having the land makes it clear that we have true control of the site. It is not a speculative activity. We plan to develop it. From a customer's due diligence perspective, evaluating the site, those are two of the key questions they initially ask. How fast can you reach power? What does the energy cost look like? We will say we own the wind farm.

FULL TRANSCRIPT

Continue the full translated transcript in StockNow.

Access every statement, the English original, and speaker-by-speaker history with StockNow Pro.

View the full transcript with Pro

More recent earnings calls

View earnings calendar